Super Purchasing for Bonded Area Steel Structure Design - Building plot plan Details entrance – Zhenyuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Control the standard by the details, show the power by quality". Our firm has strived to establish a extremely efficient and stable employees crew and explored an effective excellent command method for Circular Concrete Column Design Example, One Story Building Design, Honeycomb Design Architecture, We sincerely welcome customers from both at home and abroad to come to negotiate business with us.
Super Purchasing for Bonded Area Steel Structure Design - Building plot plan Details entrance – Zhenyuan Detail:

Introduction

Strengthening the guidance and control of the competent department of urban and rural planning on the use of state-owned land and various construction activities is conducive to promoting the land use and various construction projects to conform to the development goals and basic requirements set out in the plan, thus providing guarantee for the realization of urban and rural overall planning, rational layout, land conservation, intensive and sustainable development.

Planning conditions:

The planning conditions are the prescriptive and guiding opinions put forward by the competent department of urban and rural planning to guide and control the construction of construction land and construction projects according to the regulatory detailed planning.

Planning basis:

If the right to use state-owned land is provided by way of transfer in the planned areas of cities and towns, before the transfer of the right to use state-owned land, the competent department of urban and rural planning of the people’s government of the city or county shall, in accordance with the regulatory detailed planning, put forward the planning conditions such as the location, nature of use and intensity of development of the transferred plots as an integral part of the contract for the transfer of the right to use state-owned land.

Planning contents:

Planning conditions generally include prescriptive (restrictive) conditions, such as plot location, nature of land use, development intensity (building density, building control height, floor area ratio, green space ratio, etc.), location of major traffic entrances and exits, parking lot berths and other infrastructure and public facilities control indicators that need to be configured, etc. Guiding conditions, such as population capacity, architectural form and style, and historical and cultural protection and environmental protection requirements.

Planning provisions:

1. Planning conditions are an integral part of the contract for assigning the right to use state-owned land. For plots whose planning conditions have not been determined, the right to use state-owned land shall not be sold. If the planning conditions are not included in the state-owned land use right transfer contract, the state-owned land use right transfer contract is invalid.
2. When the competent department of urban and rural planning of the people’s government of a city or county issues the Construction Land Planning Permit, it shall not arbitrarily change the planning conditions that are part of the contract for assigning the right to use state-owned land.
3. The construction unit shall carry out construction in accordance with the requirements of the planning conditions; If it is really necessary to change, an application must be submitted to the competent department of urban and rural planning of the people’s government of the city or county.

 

The above is only applicable to the Urban and Rural Planning Law of the People’s Republic of China

Building Plot Plan

35

Plane Plan of Plant Area

108

Three-dimensional Planning Map of Tourist Area

107

Planning Map of Leisure Villa

109

Three-dimensional Planning Map of Industrial Park


Product detail pictures:

Super Purchasing for Bonded Area Steel Structure Design - Building plot plan Details entrance – Zhenyuan detail pictures


Related Product Guide:

Bear "Customer first, Excellent first" in mind, we operate closely with our customers and supply them with efficient and expert services for Super Purchasing for Bonded Area Steel Structure Design - Building plot plan Details entrance – Zhenyuan, The product will supply to all over the world, such as: Jamaica, Cyprus, Paraguay, Our products are mainly exported to Southeast Asia, the Middle East, North America and Europe. Our quality is surely guaranteed. If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.
  • The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Stephen from Argentina - 2018.09.29 17:23
    Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
    5 Stars By Renata from Russia - 2017.03.07 13:42

    Related Products